Many homeowners want rooftop solar but feel nervous about the online subsidy process. The good news: the process is fully online and quite straightforward once you know the sequence. This guide walks you through it step by step.
Before you start: keep these ready
- Your latest electricity bill (consumer number exactly as printed)
- Mobile number and email ID you can access
- Aadhaar and basic identity details
- A cancelled cheque or passbook for the bank account in the consumer's name
- A rough idea of the system size you want (see our sizing guide)
Step 1: Register on the national portal
Visit pmsuryaghar.gov.in and choose "Apply for Rooftop Solar". Select your state (Gujarat), your DISCOM (for Vadodara city and central Gujarat this is usually MGVCL) and enter your consumer number. Verify with the OTP sent to your mobile.
Tip: The consumer number must match the bill exactly. A single wrong digit is the most common reason for rejection.
Step 2: Fill in the application
Log in with your consumer number and mobile, then fill in the rooftop solar application form. You will be asked for the proposed capacity (in kW) and basic details of the premises.
Step 3: Choose a registered vendor
Only vendors registered on the portal for your DISCOM can install subsidised systems. Compare vendors on:
- Experience with electrical works, not just panel fitting
- Quality of mounting structure and cabling
- Earthing and lightning arrester included or not
- After-sales service and AMC
Read why choosing a registered vendor matters before you finalise.
Step 4: Feasibility approval from the DISCOM
The DISCOM checks whether your connection and local transformer can take the solar capacity. Once feasibility is approved, your vendor can begin installation.
Step 5: Installation
Your vendor installs DCR solar panels, a grid-tie inverter, mounting structure, ACDB/DCDB, earthing and lightning protection. A good installation usually takes one to three days for a home system.

Step 6: Submit installation details and apply for net meter
After installation, details such as panel and inverter serial numbers and photographs are uploaded on the portal. The DISCOM then inspects the system and installs a bi-directional net meter.
Step 7: Commissioning and subsidy claim
After the net meter is installed and the system is inspected, a commissioning report is generated. You then submit your bank details and cancelled cheque on the portal. The central subsidy is credited directly to your account — typically within a few weeks of a complete submission.
How long does the whole process take?
When documents are correct, most homes complete the entire journey — from application to subsidy — in roughly 4 to 8 weeks. Delays usually come from mismatched names, wrong bank details or pending inspections. See our list of common reasons subsidy applications get delayed.
Frequently asked questions
Can my solar vendor apply on my behalf?
Your vendor can guide you and upload installation details, but the registration is linked to your consumer number and mobile OTP. Keep your phone handy during registration and never share bank passwords or OTPs for payments with anyone.
What if my application shows "rejected" at feasibility?
Check the remark. Common reasons are a wrong consumer number, sanctioned load lower than the requested capacity, or transformer capacity limits. Correct the details or reduce the capacity, then re-apply with your vendor's help.
Do I need to visit the DISCOM office?
Most steps are online. You may only need to be present during inspection and net-meter installation at your premises, and sometimes to submit a form or fee if your DISCOM requires it.
Let an expert handle it
The process is simple, but small errors cost time. Naksh Power Solution supports customers from registration to subsidy credit, including net-meter coordination with the DISCOM. Contact us for a free site survey.